How To Install Plastic Gutters & Downpipes

We are leading supplier of guttering in the UK and understand that rainwater systems play a crucial role in maintaining the integrity of a building's structure.

Proper installation ensures efficient water management, preventing damage and prolonging the lifespan of both residential and commercial properties. 

This comprehensive guide will walk you through the pre-installation requirements, the detailed installation procedure, and essential tips for securing gutters and downpipes effectively.

Section 1: Pre-Installation Requirements

Before starting any installation, it is vital to adhere to health and safety guidelines to ensure a safe working environment. Proper preparation will facilitate a smoother installation process and guarantee the longevity of the gutter system.

Adhering to Health & Safety Guidelines
  • Always use appropriate personal protective equipment (PPE) such as gloves, safety goggles, and sturdy footwear.
  • Ensure ladders are stable and placed on even ground. Use ladder stabilizers where necessary.
  • Be aware of your surroundings and keep the work area clear of obstacles.
  • If working at height, use fall protection equipment such as harnesses and secure anchor points.

The gutters and downpipes supplied by Trade Warehouse are designed to be versatile and can be used in various settings, including domestic dwellings, commercial properties, and industrial units.

Proper bracket placement is crucial for a stable and functional gutter system.

Fascia Bracket Placement
  • For straight gutter runs, fascia brackets should be spaced at a maximum of 1 meter apart.
  • Ogee Gutters require brackets to be spaced no more than 800mm apart.
  • Hi-Capacity Gutters need brackets spaced at 600mm intervals.
  • When using 80mm Round Downpipe with Hi-Cap and Ogee Gutters, ensure fascia brackets are no more than 800mm apart.

Additionally, angles and stopends need extra support to maintain their position and functionality.

Support and Spacing
  • Place a fascia bracket within 150mm of any angle or stopend fitting.
  • Use supporting pipe clips on shoes, branches, and bends as needed.
  • Support downpipes below the offset and at maximum intervals of 1.8 meters.

Key Takeaway: Proper pre-installation preparation and adherence to safety guidelines are essential for a successful gutter and downpipe installation, ensuring stability and longevity of the system.

Section 2: Installation Procedure

Installing gutters and downpipes involves several critical steps, from removing old components to securing the new system. Following a systematic approach will ensure a seamless installation process.

Preparing for Installation
  • Carefully remove any old gutters and downpipes.
  • Replace old timber fascia boards with low-maintenance uPVC fascia boards.

Establishing the position of the running outlet is a crucial step. The outlet should ideally be placed over an existing drain to facilitate efficient water flow.

Positioning the Running Outlet
  • Identify the optimal location for the running outlet, usually above an existing drain.
  • Securely fix the outlet to the fascia board, ensuring it is stable.

Proper bracket placement is vital to maintain the correct gradient and ensure water flows towards the outlet.

Fixing Fascia Brackets and Union Brackets
  • Place a fascia bracket 100mm short of the furthest point from the outlet.
  • Create a fall towards the outlet using a string line, with a recommended gradient of 1:350.
  • Fix additional fascia and union brackets at the required intervals, following the spacing guidelines mentioned earlier.
  • Position brackets to avoid splitting the top edge of any timber fascia board.

Using the right screws is essential to secure the components firmly.

Screws and Fixings
  • Secure all brackets to the fascia board with two 25mm x 5mm screws or one 32mm x 6.5mm screw.
  • Ensure Fascia Expert “Cast Iron” fascia brackets have two fixings.
  • Use 25mm x 5mm screws to fix gutter unions and 32mm x 6.5mm screws for rainwater downpipe clips.
  • Always use round-headed screws as supplied by Fascia Expert.

In regions with heavy snowfall, extra precautions are necessary.

Additional Strength for Heavy Snowfall Areas
  • Secure each fascia bracket with two 25mm x 5mm screws to withstand additional weight.

Key Takeaway: A methodical installation process, from preparing the site to securing all components with the correct fixings, is critical for a reliable gutter and downpipe system.

Section 3: Final Steps in Gutter Installation

The final steps in gutter installation involve ensuring a secure fit and accommodating for weather-related expansion and contraction. Proper sealing and fitting techniques are essential for a durable system.

Lubricating Gutter Seals
  • Use a silicone spray lubricant on all gutter seals. This facilitates an easy fit and allows for movement caused by expansion and contraction in different weather conditions.

Attaching the gutter to the fascia board is a delicate process that requires precision.

Inserting and Securing the Gutter
  • Starting from the running outlet, insert the back edge of the gutter under the retaining lip of the wrap-around clip.
  • Apply slight downward pressure on the gutter to snap the front edge of the retaining clip over the front of the gutter.
  • Ensure the gutter is securely held in place and aligned properly.

Regular maintenance can extend the lifespan of your gutter system.

Maintenance Tips
  • Regularly check and clean the gutters to prevent blockages.
  • Inspect the brackets and screws periodically to ensure they are still secure.
  • Apply lubricant to the seals annually to maintain flexibility and prevent leaks.

Key Takeaway: Completing the installation with proper sealing, securing, and maintenance ensures the gutter system remains effective and durable over time.

Conclusion

Proper installation of gutters and downpipes is essential for effective water management around your property.

By following the pre-installation requirements, methodical installation procedures, and final fitting steps, you can ensure a reliable and long-lasting gutter system. Our products provide the quality and durability needed for all types of buildings, making them an excellent choice for your gutter installation needs.

For professional assistance or more information on maintaining your gutter system, feel free to explore our additional resources.

1 comment

Richmond Gutter Installation Contractors

Thank you for this comprehensive guide on installing plastic gutters and downpipes! The step-by-step instructions and visuals make the process seem much more manageable, even for DIY enthusiasts. I particularly appreciated the tips on ensuring proper alignment and spacing, as those details can often make or break a successful gutter installation. One question I have is about the long-term maintenance of plastic gutters. Are there specific cleaning or maintenance practices you would recommend to prevent clogs and ensure the system remains efficient, especially in areas with heavy rainfall? Your insights would be invaluable for ensuring a successful installation!

Leave a comment

Join Our Trade Circle

Hear about new products and get exclusive disocunts!

Get In Touch With Our Expert Team

Recently viewed